CASE STUDIES

Listed below are details of a small number of the projects that AlexanderAir have undertaken over the recent months on behalf of our customers ranging from installation of air conditioning and ventilation systems to complete mechanical services installations, including plumbing and public health services.

Our projects can range from a few hundred pounds to multi-million pound installations and can be from the supply and installation of a single split air conditioning system to the complete mechanical services supply and installation package including Design and Build projects:


Maddox Street, London W1
November 08 - October 09
Refurbishment of 7 No. houses, in to a mixture of 18 No. residential apartments and 7 No. retail areas.  Installation of all new mechanical services including plumbing, public health services, ventilation and an independent Daikin VRV air conditioning system throughout.


New Bond Street, London W1
February 09 - October 09
Fit-out of new wc's, showers and disabled facilities within refurbished/new 6 storey office development.


St. George's Street, London W1
March 09 - October 09
Fit-out of new wc's, showers and disabled facilities within new 6 storey office development.


Corbett Court, London EC1
January 09 - October 09
New build ground floor and basement restaurant within existing 5 storey City office development.

This was an extremely difficult project due to limited space for plant and access.  We provided a complete bespoke ventilation system together with a Daikin air conditioning system throughout combined with a specialist BMS control system.



Sandown Avenue, Esher
Mar 09 - Aug 09
Bespoke large new-build residential property.

We supplied and installed a Design & Build ventilation and Daikin air conditioning system throughout.



Mercedes-Benz World, Weybridge
June 09 - July 09
We adapted the existing Daikin air conditioning systems within this large flagship venue being only one of eight in the world.


Thurleigh Road, London SW12
July 09 - Present
Refurbishment and extension of a large 4 storey victorian residential property.

We supplied and installed a Design & Build ceiling ducted Daikin air conditioning system througout the 1st and 2nd floors serving the bedrooms.


Royal Mid-Surrey Golf Club, Surrey
2008
A bespoke 2 storey clubhouse overlooking the grounds with feature glass walls.

We supplied and installed a Design & Build air conditioning solution to provide cooling to this area, whilst incorporating the air conditioning systems to become an architectural feature of this area.



Furness House, Redhill
October 09 - Present
Refurbishment of the 1st floor level within this 4 storey office development.

We installed specialist cross talk attenuators and fire dampers which have been installed in to the new fire and acoustic barriers and in to the low velocity supply duct.

In addition, we removed and reinstated the VAV module line systems and carried out modifications to the same including installing new return air grilles as well as modifying the perimeter heating system.

New mechanical services have been installed to serve the kitchen area.

We have to date carried out the mechanical installations on this property in its entirety over the past few years and continue to work on the same for our clients on an ongoing basis.


Dukes Street, London W1
August 09 - September 09
Removal of existing R22 air conditioning systems and supply and installation of a Daikin multi-split air conditioning system throughout 3 floors within this exclusive West End London Art Gallery.


Rock & Rose Restaurant, Richmond
August 09 - October 09
This project had a particular problem with the lower ground level kitchen over heating due to its unusual shape and large cooker hood.

We designed and installed a high level ducted single split air conditioning system running either side of the high level cooker hood with jet nozzles fitted to allow independent direction of the air flow to suit the clients catering staff needs.


ASK Restaurant, Abingdon
2008
Refurbishment of an old architectural church building in to a new branded restaurant.

We carried out the installation of all the mechanical services to the project to include customer wc facilities, staff wc and shower facilities.

In addition, we provided the mechanical services installation to the kitchen and associated prep areas including the installation of all applicable appliances.


Prezzo Restaurant, Haverhill
2008
New build restaurant within multi-plex complex.

We carried out the installation of all mechanical services to the project, to include the customer wc facilities, staff wc and shower facilities.

In addition, we provided the mechanical services installation to the kitchen and associated prep areas including the installation of all applicable appliances.



If you would like further details of any of the above projects AlexanderAir have undertaken or are currently involved in, please contact our Sales Department who will be pleased to provide you with details of the same.